Kristel Sapungan

Kristel Sapungan

Content Writer

at

Mastt

LinkedIn

About 
Kristel Sapungan

A licensed architect in the Philippines, Kristel Sapungan spent her early career on residential and mixed-use projects, handling site inspections and construction documentation. She now researches and produces long-form construction guides as a Content Producer at Mastt.

At Mastt, Kristel researches and structures articles with external experts. She also runs outreach to industry contributors and content creators and manages collaborations.

Kristel Sapungan tracks how construction is changing for the people running capital projects, from data center growth to AI adoption in project teams. She holds a Bachelor of Science in Architecture from the Technological Institute of the Philippines (TIP) and took part in a design-build studio in Nepal focused on architecture for the public good. At Mastt, she works with external experts to produce construction content that project teams can use and manages contributor and creator collaborations.

EDUCATION AND CERTIFICATIONS

Professional certifications‍

Licensed Architect
Professional Regulation Commission (PRC), Philippines

Education

Bachelor of Science in Architecture
Technological Institute of the Philippines

Meet the people behind our content

Every article on Mastt is written or reviewed by a named construction professional with verifiable credentials and direct project experience.