Mastt Logo
Why
Product
Product Tour
A video of Mastt sofware showing a dashboard with a map, charts and visualizations for project progress and health
Explore Mastt
Watch how Mastt is used on $25bn+ of capital improvement portfolios
REPORTING PLATFORM
Dashboards & Reporting
Contracts & Payments
Budget & Forecasts
Risks & Opportunities
Schedule
Integrations
AI
Solutions
Use Cases
Capital Projects
Programs & Portfolios
Enterprise
roles
Project Consultants
Project Owners
Industries
Education
Transportation
Aviation
Events
Public Works
Civil
Utilities
Residential
Real Estate Development
Pricing
Customers
Resources
Learn
Free Templates
Download free tools, guides, checklists, plans and more
Dashboard Examples
Download free dashboards & reports
Articles
Learn about Construction Project Management best practices
Topics
Full guides on the important topics around construction management
Webinars
Watch ConTech in action
SUPPORT
FAQs
Get answers for common questions
Get Help
Expert coaching, technical support and guidance
Trust Center
Learn how we protect your data and privacy.
Log In
Australia / APAC
North America Region
MENA
Rest of World
Log InSee Product Tour
02 9133 4355
Talk to Sales
|
Log In
Australia / APAC
North America Region
MENA
Rest of World
Start for Free
Mobile Menu Icon
Resources
/
Glossary

Manufacturing Design and Build

Manufacturing Design and Build integrates engineering, procurement, and construction, focusing on modular, prefabricated components for efficient, sustainable project delivery.

Topic: 
Project Delivery Methods

Contents

Example H2
Related blog post

What is Design-Bid-Build? The Traditional Project Delivery Model

Learn what design-bid-build means, how it works in construction, and why it’s a trusted method for projects needing clear roles, fixed budgets, and transparency.

What is Manufacturing Design and Build?

Manufacturing design and build is a project delivery method, much like the Design-Build approach, where building components for manufacturing facilities are specifically designed for off-site fabrication and on-site assembly. This approach integrates engineering, procurement, and construction processes to streamline project timelines, enhance quality, and reduce costs.

Manufacturing design and build align with Design for Manufacture and Assembly (DfMA) principles, focusing on creating standardized, modular components that simplify manufacturing and assembly.

Popular
Free Template

Procurement Plan

A procurement plan template for capital project owners providing a comprehensive strategy to engage goods, services, and contractors. Includes timelines, budget considerations, supplier selection criteria, and contract management procedures, to ensure successful project completion.

Use this Template

About Manufacturing Design and Build

In the Manufacturing Design and Build method, designs are tailored for efficient production in controlled environments, such as factories, before being transported to the construction site for quick installation. By consolidating processes, Manufacturing Design and Build addresses the challenges of traditional construction methods, offering solutions for industries like manufacturing, logistics, healthcare, and renewable energy.

For example, a production facility using this method may incorporate prefabricated structural elements, mechanical systems, and even complete modular units, enabling quicker project delivery without compromising quality or sustainability.

Automate Construction Project Management  

How Does Manufacturing Design and Build Work?

The Manufacturing Design and Build process integrates modern construction techniques with advanced planning to deliver efficient, high-performing facilities. It leverages prefabrication, modular construction, and innovative design strategies to optimize every project lifecycle stage.

Key Phases of Manufacturing Design and Build

Design & Build Process
Key manufacturing phases
Planning
Planning
Key activities:
  • Requirements
  • Design analysis
  • Resource planning
  • Risk assessment
  • Budget allocation
2-3
Months
15%
Cost
Engineering
Engineering
Technical focus:
  • Specifications
  • Process design
  • Quality control
  • Supply chain
  • Compliance
3-4
Months
25%
Cost
Fabrication
Production
Manufacturing:
  • Production
  • Testing
  • Monitoring
  • Inventory
  • Quality checks
4-6
Months
35%
Cost
Assembly
Assembly
Installation:
  • Logistics
  • Staging
  • Assembly
  • Testing
  • Safety
2-3
Months
15%
Cost
Handover
Completion
Final phase:
  • Testing
  • Training
  • Documentation
  • Certification
  • Maintenance
1-2
Months
10%
Cost
  1. Conceptual Planning and Design Development: Stakeholders define operational requirements, project goals, and budget constraints. Designers create plans optimized for DfMA, focusing on modularity and standardization.
  2. Detailed Engineering and Prefabrication Planning: Engineers develop precise technical drawings to ensure compatibility and ease of assembly. Components are designed for off-site production, reducing on-site complexities.
  3. Off-Site Fabrication: Building elements are manufactured in controlled environments, ensuring high quality and reduced waste. Examples include prefabricated steel frames, mechanical systems, and cladding panels.
  4. On-Site Assembly and Installation: Prefabricated components are transported to the construction site for rapid assembly. This reduces construction time, minimizes disruptions, and enhances safety.
  5. Testing and Commissioning: The facility undergoes operational testing to ensure all systems function as designed. Any adjustments are made to optimize performance before project handover.

This structured approach eliminates inefficiencies commonly found in traditional construction methods. For instance, in a logistics warehouse project, prefabricated storage systems and conveyor lines can be installed seamlessly, reducing project timelines and ensuring operational readiness.

Why is Manufacturing Design and Build Beneficial for Construction Projects?

The Manufacturing Design and Build model offers transformative advantages, aligning with strategies like progressive design-build, making it a preferred choice for complex industrial projects. Its emphasis on efficiency, quality, and sustainability directly addresses modern construction challenges.

Key Benefits:

  • Reduced Construction Timelines: Off-site fabrication significantly accelerates the assembly process, allowing projects to meet tight deadlines.
  • Cost Efficiency: Prefabrication minimizes material waste, streamlines labor costs, and reduces on-site inefficiencies.
  • Enhanced Quality Control: Manufacturing in controlled environments ensures components meet strict quality standards.
  • Sustainability: By optimizing materials and reducing on-site activity, the model lowers the project’s carbon footprint.
  • Flexibility and Scalability: The modular nature of prefabricated components allows projects to scale efficiently and adapt to future needs.

By incorporating these benefits, Manufacturing Design and Build enables industries to construct facilities that are operationally efficient and environmentally responsible. For example, a renewable energy plant might adopt this method to install pre-assembled turbines and modular control systems, ensuring high precision and faster deployment.

How Does DfMA Influence Manufacturing Design and Build?

Design for Manufacture and Assembly (DfMA) shares foundational elements with methods like Design-Build-Operate (DBO), emphasizing modularity and streamlined processes. DfMA prioritizes designing components that are easy to manufacture off-site and assemble on-site, reducing time, cost, and complexity.

Key Elements of DfMA in Manufacturing Design and Build

  • Standardization: Ensures components are uniform and compatible, simplifying production and assembly.
  • Prefabrication-Friendly Designs: Focuses on creating modules that can be produced efficiently in factories.
  • Streamlined Assembly: Reduces on-site labor by enabling quick, straightforward assembly processes.
  • Sustainability: Minimizes waste by optimizing material usage and transportation logistics.

For example, a healthcare facility constructed using DfMA principles might include prefabricated wall panels with integrated electrical wiring and plumbing systems. These panels are manufactured off-site and assembled on-site, drastically reducing construction timelines and ensuring consistent quality.

DfMA vs. Traditional Construction

Aspect Design for Manufacture and Assembly (DfMA) Traditional Construction
Timelines Prefabrication significantly reduces on-site construction time Longer timelines due to sequential processes and on-site delays
Cost Efficiency Optimized designs lower labor costs and minimize material waste Higher costs from inefficiencies, rework, and on-site labor
Quality Control Manufactured in controlled environments, ensuring consistent quality Variable quality due to on-site conditions and manual processes
Sustainability Reduces material waste and carbon footprint through efficient processes Higher environmental impact from on-site waste and inefficiencies
Customization Limited customization due to standardized components High customization but at the expense of increased complexity
Safety Off-site fabrication reduces on-site risks and hazards Greater safety risks due to extensive on-site activities
Scalability Modular components allow for easier scaling and future expansion Scaling requires significant additional resources and time
Logistical Complexity Requires detailed planning for transportation and on-site assembly Simpler logistics but more on-site coordination challenges

What Are the Types of Manufacturing Design and Build Projects?

Manufacturing Design and Build projects can be categorized based on the scope of prefabrication, the complexity of the design, and the project's specific requirements. Each type offers unique advantages tailored to different industries and project goals.

Common Types of Manufacturing Design and Build Projects

  • Modular Construction Projects: Fully prefabricated modules are manufactured off-site and assembled on-site. Examples: Modular data centers, healthcare facilities, and portable classrooms.
  • Hybrid Prefabrication Projects: Combines traditional on-site construction with prefabricated components, sharing similarities with flexible methods like job order contracting. Examples: Logistics warehouses with prefabricated steel frames and on-site concrete foundations.
  • Turnkey Manufacturing Projects: The contractor delivers a fully operational facility, including equipment installation. Examples: Production plants with integrated assembly lines and testing areas.
  • Retrofit and Expansion Projects: Existing facilities are upgraded or expanded using prefabricated components. Examples: Retrofitting an older factory with energy-efficient HVAC systems.
  • Infrastructure Support Projects: Focused on supporting industries, such as transportation or utilities. Examples: Prefabricated bridges, pipelines, or electrical substations.

Each type is designed to optimize specific aspects of manufacturing, from reducing timelines to enhancing operational efficiency. For instance, modular construction is ideal for projects requiring rapid deployment, while hybrid prefabrication suits projects balancing cost and customization.

What is the Role of a Manufacturing Design and Build Contractor?

A Manufacturing Design and Build contractor oversees all aspects of the project, leveraging frameworks like Engineering, Procurement, and Construction Management (EPCM) to ensure a seamless transition from design to assembly. Their expertise bridges the gap between conceptual planning and operational execution, aligning project goals with industry-specific requirements.

Key Responsibilities of a Contractor:

  • Design Coordination: Collaborate with architects and engineers to create efficient, prefabrication-friendly designs.
  • Procurement Management: Source materials and components that meet quality standards and budget constraints.
  • Quality Assurance: Conduct inspections at manufacturing facilities and during on-site assembly.
  • Schedule Oversight: Ensure project milestones are met, avoiding delays or cost overruns.
  • Client Communication: Maintain transparency with stakeholders, providing regular updates and addressing concerns.

For example, in a manufacturing plant project, the contractor ensures that prefabricated conveyor systems align with the plant's operational workflow, coordinating design modifications if needed. This proactive approach ensures the facility meets client expectations and industry standards.

Automate Construction Project Management  

Advantages and Disadvantages of Manufacturing Design and Build

While Manufacturing Design and Build offers numerous advantages, it is not without challenges. Understanding these pros and cons helps project owners make informed decisions.

Advantages

  • Efficiency: Prefabrication accelerates timelines and reduces construction delays.
  • Cost Savings: Optimized designs minimize material waste and lower labor costs.
  • Improved Safety: Controlled manufacturing environments reduce on-site risks.
  • Sustainability: Reduces environmental impact through efficient resource use.

Disadvantages

  • Initial Investment: Prefabrication requires upfront planning and design costs.
  • Limited Customization: Standardized components may restrict design flexibility.
  • Logistical Complexity: Coordinating transportation and assembly of large prefabricated elements can be challenging.

By balancing these factors, project owners can leverage the benefits of Manufacturing Design and Build while mitigating potential challenges. For instance, early collaboration with experienced contractors helps address logistical complexities and optimize prefabrication strategies.

Examples of Manufacturing Design and Build

Real-world examples illustrate the practical application of Manufacturing Design and Build in diverse industries:

  • Healthcare Facility Construction: A modular hospital wing, prefabricated off-site, allows for rapid expansion of medical services. Example: Prefabricated isolation units installed during the COVID-19 pandemic.
  • Logistics and Warehousing: Prefabricated steel structures and modular shelving systems streamline warehouse construction. Example: Amazon’s automated distribution centers featuring prefabricated conveyor systems.
  • Energy Projects: Renewable energy facilities leverage modular turbine assemblies for efficient installation. Example: Wind farms using prefabricated nacelles and blades for on-site assembly.
  • Educational Infrastructure: Prefabricated classrooms provide cost-effective, scalable solutions for expanding schools. Example: Modular classrooms implemented in rural areas to address overcrowding.
  • Industrial Manufacturing Plants: Factories use prefabricated production lines and structural elements for rapid deployment. Example: Tesla’s Gigafactories, built using modular construction techniques.

These examples demonstrate how Manufacturing Design and Build adapts to various project needs, delivering value across sectors by enhancing speed, efficiency, and sustainability.

Posts on this topic

How EPC Project Delivery Works
Project Delivery Methods

How EPC Project Delivery Works

Learn how EPC project delivery works, from engineering to construction, and see how it helps project owners manage costs, risks, and timelines effectively.

How EPC Project Delivery Works

Jacob Gibbs

What Is a Managing Contractor Delivery Model?
Project Delivery Methods

What Is a Managing Contractor Delivery Model?

Learn what the Managing Contractor Delivery Model is, how it works, its pros and cons, and how it compares to other project delivery methods.

What Is a Managing Contractor Delivery Model?

Jamie Cerexhe

Alternative Delivery Methods in Construction
Project Delivery Methods

Alternative Delivery Methods in Construction

Learn how alternative delivery methods like Design-Build and CMAR help construction projects stay on budget, reduce risk, and finish faster.

Alternative Delivery Methods in Construction

Doug Vincent

Powering Construction Project Management with easy-to-use tools

Start for FreeWatch Product Tour
Mastt Logo
Stay up-to-date with Mastt:
You're in the loop
Oops! Something went wrong while submitting the form.

Solutions

Use Cases

Managing Contract Variations
Project Timeline Management
Managing Construction Contracts
Client Dashboard
Construction Client Management
All Use Cases

Product

Dashboards & ReportingBudget & ForecastsRiskScheduleContracts & PaymentsIntegrationAll Features

Industries

Education
Transportation
Aviation
Events
Public Works
Civil
Utilities
Residential
Real Estate Development
All Industries

Customers

Featured CustomerSuccess Stories

Compare

Mastt vs ProcoreMastt vs KahuaMastt vs InEightMastt vs AconexMastt vs iTWOcx

Resources

Free TemplatesWebinarsGlossaryArticlesTopicsFAQProject Management FirmsRisksHelp Pages

Company

AboutAboutConstruction Project ManagementContact UsPrivacyLegalSecurity
© Copyright 2025 Mastt.
Be part of our community
LinkedIn Icon