AI Payment Compliance

Instant AI Verification for Construction Payments & Invoices

Turn reviewing payments into a simple, automated process. Upload payments or invoices and let AI instantly detect compliance issues, errors, and missing documentation - no more days lost to manual checks or costly disputes.

Mastt interface showing an AI Construction Invoice Review for Payment 001 (Urban Accommodation Development). The AI Payment Review Checklist confirms GST is correctly calculated at 10%, with subtotal $44,970, GST $4,497, and total $49,467, marked Accepted.

Delivering AI power to the world's best in construction project management

A logo with black text that says "Australian Department of Defence"
Jacobs company logo with stylized 'JACOBS' text in bold black letters on white background.
The Projects Group logo with blue and orange squares beside the text.
The word Tango in bold orange letters with a stylized lowercase g.
A logo of RPS.
Wellington Water logo with stylized W and water droplet in blue and teal colors.
Logo with a blue cross and heart symbol next to text St Vincent's Health Australia.
Superyacht Project Management logo with a circular symbol above the text.
Summertown Interiors logo with a stylized white tree on a red square and text on gray background.
SOILCO logo with stylized dark and green shapes forming an S above bold text
Black and white diagram of a traditional crossbow with labeled parts and descriptions.
Octopus Energy Generation logo with octopus and energy words in dark and green text.
Waterfall with wide streams flowing down rocky cliffs surrounded by green hills and trees.
Exagen company logo with purple letters and a teal accent on the letter X.
The Australian Army emblem with crown and sunburst above the word Army in red text.
Super Retail Group text logo with three slanted bars in orange, blue, and red on the right.
HOLT Group logo with stylized vertical bars and bold letters.
Newcastle Airport logo with colorful star-shaped graphic and text.
Text logo with PAULSON above PUERTO RICO, separated by horizontal lines.
Cheo in bold rounded purple letters on a transparent background.
Retire Australia company logo with blue diamond icon next to gray text.
Logo with maroon double arrow curving right above lowercase 'cfb' and text Carrollton-Farmers Branch ISD.
COHA Group logo with stylized 'A' and horizontal line beneath.
Airport Retail Group
A logo with black text that says "Australian Department of Defence"
Jacobs company logo with stylized 'JACOBS' text in bold black letters on white background.
The Projects Group logo with blue and orange squares beside the text.
The word Tango in bold orange letters with a stylized lowercase g.
A logo of RPS.
Wellington Water logo with stylized W and water droplet in blue and teal colors.
Logo with a blue cross and heart symbol next to text St Vincent's Health Australia.
Superyacht Project Management logo with a circular symbol above the text.
Summertown Interiors logo with a stylized white tree on a red square and text on gray background.
SOILCO logo with stylized dark and green shapes forming an S above bold text
Black and white diagram of a traditional crossbow with labeled parts and descriptions.
Octopus Energy Generation logo with octopus and energy words in dark and green text.
Waterfall with wide streams flowing down rocky cliffs surrounded by green hills and trees.
Exagen company logo with purple letters and a teal accent on the letter X.
The Australian Army emblem with crown and sunburst above the word Army in red text.
Super Retail Group text logo with three slanted bars in orange, blue, and red on the right.
HOLT Group logo with stylized vertical bars and bold letters.
Newcastle Airport logo with colorful star-shaped graphic and text.
Text logo with PAULSON above PUERTO RICO, separated by horizontal lines.
Cheo in bold rounded purple letters on a transparent background.
Retire Australia company logo with blue diamond icon next to gray text.
Logo with maroon double arrow curving right above lowercase 'cfb' and text Carrollton-Farmers Branch ISD.
COHA Group logo with stylized 'A' and horizontal line beneath.
Airport Retail Group

AI Handles What No Human Can

Mastt reviews every payment against the contract automatically, eliminating the impossible burden of manual verification across multiple projects.

Your AI Payment Compliance Checklist

Mastt's AI reads entire contracts and pulls out everything required before you can approve payment.

When invoices and payment requests arrive, you'll know exactly what needs checking - no more digging through endless pages or creating checklists. Make every payment approval with confidence, speed, and proof.

Talk to Sales >

Executive Dashboard for Capital Improvement Programs
Executive Dashboard for Capital Improvement Programs

AI That Reviews Invoices, Payments - Automatically

Mastt's AI instantly cross-references every payment request against the contract terms, local regulations, and variations/change orders - catching discrepancies that even experienced PMs miss.

Sleep easy knowing every dollar paid is a dollar earned.

Talk to Sales >

AI-Driven Confidence Across Every Project

Sleep easy knowing every project, contract and payment is being AI reviewed with human in the loop.

Every payment gets the same thorough review, giving you consistent confidence no matter how large your responsibility grows. Build your career on a foundation of certainty, not worry.

See Pricing >

Executive Dashboard for Capital Improvement Programs

Experience Mastt AI Risk-Free

Upload your first document and see instant AI-powered insights. Join construction professionals who've already discovered smarter project management.

Start for Free
Project manager using Mastt on tablet to monitor budget, schedule, and performance on-site

Perfect for Construction Leaders Who Value Smart Efficiency

See what project managers and construction executives are saying about AI transformation.

It instantly takes workload off of people's plates. It's an easy buy. You know, it's something that you can put some reliability on.

— School District Program Manager

I'm thrilled to get the automated entry features. Really helps the team streamline that process which is great.

— Hospital Project Manager

This is a great timing. We're realizing it's time to make sure we are not getting surpassed by the competition or maybe even jumping to stay ahead.

— Construction Executive

The AI Advantage

Construction teams using AI are already seeing dramatic improvements

90%
Time Savings on Data Entry
100%
Accuracy with Human Verification
60sec
Process 100+ Page Documents
Zero
Missed Compliance Requirements

Built for Construction's Trust Standards

We understand that accuracy isn't optional in construction. Our AI is designed with the verification and control you need.

See the Work

No more questioning if the AI made it up. Compare every extraction to exactly where it came from in the source document.

You Stay in Control

Nothing reaches your clients without your approval. You control what gets saved and prevent embarrassing mistakes.

Transparent Process

Clear confidence indicators show what needs your attention. You'll know exactly when something requires verification.

AI Integrated With Construction Project Management

Discover how AI integrated with our modules work together work faster, smarter and with 10x more impact.

AGENT

AI Agent for Construction

A simple white robot head icon with two eyes and an antenna on a dark background.

Agent

Multiply your people with AI Agents. Helps one person produce the output of many.

Minimalist white icon of three vertical lines and a diagonal line resembling a stylized book.

Knowledge

AI that knows your company’s templates, procedures and lessons learned.

Three white rounded rectangles arranged in a grid on a dark blue background.

Templates

Upload the templates you already use, and your AI Agent drafts on-brand, every time.

Two interlinked chain links forming a diagonal connection on a dark gray background.

Workflow

Set up a process once, and let Agent run it every time.

Learn More
User interface showing approval queue with tasks and a completion popup with logged updates and draft reply.
Project

Take control of your project from start to finish & work with AI

Project Dashboard

Keep track of projects with live, interactive reports 24/7. See rich, powerful visualizations.

Project Controls

Unify cost, risk, schedule, and reporting in a simple construction project controls system.

Team Collaboration & Sharing

Easily invite team members and share project data in real time.

Work With Trusted AI

Automate repetitive tasks with Mastt’s AI data entry and template tools.

Learn More
Collage of business and construction project management interfaces with profile photos of a man in a suit, a woman holding a tablet, and a construction worker wearing a hard hat and safety vest, each marked with a green checkmark.
Program

Unlock program visibility, control and results

Program Dashboard

Mastt brings every project in your program into one clear, connected view.

Program Controls

Roll up cost, risk, schedule, and reporting from every project into one unified, real-time view.

Data Confidence

Consistency across every project. Secure, centralized data, full audit trails, and real-time decision-making.

AI That Scales Across Your Portfolio

Mastt’s trusted AI eliminates the admin and manual standardization that slow your team down.

Learn More
User interface displaying multiple project cards with images of buildings and construction, showing project counts and team member icons with check marks.
Dashboard

Turn project chaos into clarity with real-time dashboards

Project Dashboard

Keep track of projects with live, interactive reports 24/7

Report Templates

Fast & automated reports from project status to project portfolio reports

Powerful Visualizations

Capital project charts, maps, visualizations and other components out of the box!

Report Storage

Snapshot & store entire projects or reports for record keeping & compliance

Learn More
Dashboard interface showing Budget and Committed metrics, a dropdown menu with options to Download PDF or Share Dashboard highlighted with a cursor, and key performance indicators for Scope, Time, Cost, Risk, Safety, and Quality.
Cost

Project cost management software for total control

Project Budgeting

Digital ledgers and smart forms for financial precision

Variance Analysis

Track costs back to budgets and see unders/overs

Commitments

Centralize all contracts & payments back to budgets

Cash Flow & Forecasting

Report on cash flow actuals, forecasts, and baselines

Learn More
Finance dashboard showing Budget vs Actual chart with colored bars for Budget, Variance, Forecast Final Cost, and Payment Progress, and a Finance Bar Chart by Project with purple and green bars.
Schedule

Know what’s happening, what’s next, and what’s at risk

Complete Visibility

Manage the complete project lifecycle across your portfolio

Key Milestones

Tracks your project through key milestones

Track Phases & Stages

Manage projects through clear phases, stages and gates

Health Reporting

Measure performance of a portfolio of projects

Learn More
Project schedule interface showing task progress with green checkmarks, colored bars, and icons, overlaid with Oracle P6 and Microsoft Project logos.
Risk

Risk management made easy

Best Practice

Risk Management process made simple and configured to your likelihood & impact ratings

Impacts & Treatments

Streamline Risk Analysis on your 5x5 or 4x4 Risk Matrix and identify Treatments

Report & Workshop

Visualize Risks for fast, easy reporting and workshopping. Generate a Risk Register

Project or Program

Maintain Risk Registers at a Project or Program / Portfolio level

Learn More
Project risk matrix for Pre-Treatment showing likelihood versus impact with colored risk levels and a table listing three risks with post-ratings labeled Low, Very Low, and Medium.
Document Management

Everything you need for document management

One central hub

Store every contract, report and project file in one secure place.

Organized project folders

Structure every project with clear, consistent folders your whole team can navigate.

AI Chat with your files

Ask questions in plain English and get answers from your documents instantly.

Linked to finances

See every document tied back to its source in your project - contract, payments, changes and more.

Learn More
Document list with folders and files showing AI Ready status, classifications, and menu options including Ask AI.

Frequently Asked Questions

Can I see where AI extracted payment information from contracts?

Yes. Mastt shows exactly where every extracted detail came from in the source document. Compare AI's findings against the original contract pages. This transparency lets you verify AI's work before approving any payment.

Is AI payment review included in Mastt's pricing or an add-on?

AI payment review is included in Mastt's plans. Your first project is free with AI Autofill and AI Templates included - no credit card required. Professional plans ($165/project monthly on average) include advanced AI tools. Enterprise plans (10+ projects) offer custom pricing. See Mastt's pricing details.

What errors does AI invoice verification detect?

AI invoice verification flags compliance issues, billing errors, duplicate entries, and missing documentation. It checks invoices against contract rates, approved variations, change orders, and local regulations. Every flagged issue shows exactly where in the contract it conflicts.

How does automated invoice processing work in Mastt?

Upload your contract PDF once - AI extracts payment requirements automatically. When invoices arrive, upload them and AI processes the document in seconds, comparing line items against contract terms and flagging discrepancies. You review flagged issues and approve or reject payments.

What is AI payment review for construction invoices?

AI payment review automatically verifies contractor invoices against contract terms, identifying compliance issues, errors, and missing documentation before approval. Upload your contract and invoices - AI cross-references every payment request against contract specifications, local regulations, and approved change orders instantly.

Ready to Lead with AI?

Join forward-thinking construction teams already transforming their projects with artificial intelligence.