Project Management Software for Consultants

Take on more clients without dropping quality

Manage budgets, risks, schedules, and client reporting across every construction project — from one platform built for consultants, not contractors.

Project management software for consultants dashboard showing budget, site photo, milestones and team avatars.

Work smarter, deliver more, and win client trust instantly

16+
White calendar icon with two rings at the top and a check mark inside.
Hours saved per project, per month
$12k+
In resource savings per project
100%
Of customers see a boost in stakeholder satisfaction

Delivering power to the world’s leading project management consultants

A logo with black text that says "Australian Department of Defence"
Jacobs company logo with stylized 'JACOBS' text in bold black letters on white background.
The Projects Group logo with blue and orange squares beside the text.
Repsol logo featuring an abstract circular shape with an orange top half, a red bottom half, and a white stripe across the middle above the bold navy blue text 'REPSOL'.
The word Tango in bold orange letters with a stylized lowercase g.
A logo of RPS.
Wellington Water logo with stylized W and water droplet in blue and teal colors.
Logo with a blue cross and heart symbol next to text St Vincent's Health Australia.
Superyacht Project Management logo with a circular symbol above the text.
Summertown Interiors logo with a stylized white tree on a red square and text on gray background.
SOILCO logo with stylized dark and green shapes forming an S above bold text
Black and white diagram of a traditional crossbow with labeled parts and descriptions.
KBR logo with stylized globe and digital squares design to the left of the letters KBR.
Octopus Energy Generation logo with octopus and energy words in dark and green text.
Waterfall with wide streams flowing down rocky cliffs surrounded by green hills and trees.
Exagen company logo with purple letters and a teal accent on the letter X.
The Australian Army emblem with crown and sunburst above the word Army in red text.
Super Retail Group text logo with three slanted bars in orange, blue, and red on the right.
HOLT Group logo with stylized vertical bars and bold letters.
Newcastle Airport logo with colorful star-shaped graphic and text.
Text logo with PAULSON above PUERTO RICO, separated by horizontal lines.
Cheo in bold rounded purple letters on a transparent background.
Retire Australia company logo with blue diamond icon next to gray text.
Logo with maroon double arrow curving right above lowercase 'cfb' and text Carrollton-Farmers Branch ISD.
COHA Group logo with stylized 'A' and horizontal line beneath.
Airport Retail Group
A logo with black text that says "Australian Department of Defence"
Jacobs company logo with stylized 'JACOBS' text in bold black letters on white background.
The Projects Group logo with blue and orange squares beside the text.
Repsol logo featuring an abstract circular shape with an orange top half, a red bottom half, and a white stripe across the middle above the bold navy blue text 'REPSOL'.
The word Tango in bold orange letters with a stylized lowercase g.
A logo of RPS.
Wellington Water logo with stylized W and water droplet in blue and teal colors.
Logo with a blue cross and heart symbol next to text St Vincent's Health Australia.
Superyacht Project Management logo with a circular symbol above the text.
Summertown Interiors logo with a stylized white tree on a red square and text on gray background.
SOILCO logo with stylized dark and green shapes forming an S above bold text
Black and white diagram of a traditional crossbow with labeled parts and descriptions.
KBR logo with stylized globe and digital squares design to the left of the letters KBR.
Octopus Energy Generation logo with octopus and energy words in dark and green text.
Waterfall with wide streams flowing down rocky cliffs surrounded by green hills and trees.
Exagen company logo with purple letters and a teal accent on the letter X.
The Australian Army emblem with crown and sunburst above the word Army in red text.
Super Retail Group text logo with three slanted bars in orange, blue, and red on the right.
HOLT Group logo with stylized vertical bars and bold letters.
Newcastle Airport logo with colorful star-shaped graphic and text.
Text logo with PAULSON above PUERTO RICO, separated by horizontal lines.
Cheo in bold rounded purple letters on a transparent background.
Retire Australia company logo with blue diamond icon next to gray text.
Logo with maroon double arrow curving right above lowercase 'cfb' and text Carrollton-Farmers Branch ISD.
COHA Group logo with stylized 'A' and horizontal line beneath.
Airport Retail Group

How consultants deliver better projects with Mastt

Mastt helps construction consultants deliver faster, with more control — so you can focus on impressing clients and winning the next engagement.

Blue icon showing a computer monitor and a smartphone overlapping on a light blue rounded square.

All projects in one place

Manage every construction project and program from a single dashboard. Get portfolio-wide visibility into budgets, timelines, and project health — instantly.

Icon of two overlapping blue documents with lines on the front one, on a rounded light blue square.

Standardize processes & methodology

Roll out consistent reporting templates, risk frameworks, and cost structures across every client engagement. New team members onboard in minutes, not weeks.

Blue calendar icon with a checkmark in the center, on a rounded light blue square.

Boost productivity & reduce admin

Replace spreadsheets and manual data entry with AI-powered automation. Spend time on technical delivery and client strategy — not formatting reports.

Blue trophy cup icon with two handles centered on a rounded light blue square.

Raise the bar on client delivery

Give every project manager on your team the tools to deliver consistent, high-quality outcomes. Built-in project controls keep scope, cost, and risk on track.

Mastt project status dashboard with budget, contract costs, a cost chart, project milestones, and report sharing controls.

Impress clients with instant insights

Eliminate manual reporting with real-time dashboards that track project health, costs, and timelines. Generate client-ready status reports in minutes — not days. Walk into every steering committee meeting with data that builds confidence.

Standardize delivery, multiply efficiency

Manage schedules, budgets, risks, and compliance in one platform. Track change orders, forecast final costs, and flag issues before they escalate. Automated alerts keep your team proactive across every project phase — from pre-construction through close-out.

Watch Demo Video Now >

Project consultant holding documents with overlaid dashboard charts showing cost trends, schedule timeline, and status bars.
Mastt portfolio view showing total projects, program budget, committed spend, project map, and traffic light health indicators.

Protect your reputation with complete visibility

See every client project's cost, schedule, and risk status in one centralized view. Spot issues early with traffic light indicators. Maintain full audit trails across reporting cycles — so you're always governance-ready when clients ask.

Start free — no credit card required

Your first project is free. Set up in minutes. Deliver your first client report the same week.

The best project management consultants trust Mastt

Leading PMC firms use Mastt to manage billions of dollars in capital projects. Here's how they deliver better outcomes for clients.

Trusted by industry leaders who build the future

Secure, compliant, and always here to support your project delivery

White shield icon with a pointed bottom and an inverted chevron shape inside, set on a rounded blue square.

Security and compliance

Enterprise-grade encryption, regional data hosting, and SOC 2-aligned controls. Built for teams handling sensitive government and infrastructure project data.

White handshake icon symbolizing agreement or partnership.

Industry partnerships

Used by defense departments, global engineering firms, and Fortune 500 organizations. Integrates with existing enterprise processes and systems.

White clock icon with an arrow circling clockwise around it.

24/7 customer support

Dedicated human support via live chat, email, and phone to assist you at every step in delivering projects. Our support team understands the demands of management consulting and professional project delivery.

Everything you need to manage construction projects

Ditch the spreadsheets. Mastt gives your consulting team project controls, reporting, cost management, and AI — all in one platform built for construction delivery.

AGENT

AI Agent for Construction

A simple white robot head icon with two eyes and an antenna on a dark background.

Agent

Multiply your people with AI Agents. Helps one person produce the output of many.

Minimalist white icon of three vertical lines and a diagonal line resembling a stylized book.

Knowledge

AI that knows your company’s templates, procedures and lessons learned.

Three white rounded rectangles arranged in a grid on a dark blue background.

Templates

Upload the templates you already use, and your AI Agent drafts on-brand, every time.

Two interlinked chain links forming a diagonal connection on a dark gray background.

Workflow

Set up a process once, and let Agent run it every time.

Learn More
User interface showing approval queue with tasks and a completion popup with logged updates and draft reply.
Program

Unlock program visibility, control and results

Program Dashboard

Mastt brings every project in your program into one clear, connected view.

Program Controls

Roll up cost, risk, schedule, and reporting from every project into one unified, real-time view.

Data Confidence

Consistency across every project. Secure, centralized data, full audit trails, and real-time decision-making.

AI That Scales Across Your Portfolio

Mastt’s trusted AI eliminates the admin and manual standardization that slow your team down.

Learn More
User interface displaying multiple project cards with images of buildings and construction, showing project counts and team member icons with check marks.
Dashboard

Turn project chaos into clarity with real-time dashboards

Project Dashboard

Keep track of projects with live, interactive reports 24/7

Report Templates

Fast & automated reports from project status to project portfolio reports

Powerful Visualizations

Capital project charts, maps, visualizations and other components out of the box!

Report Storage

Snapshot & store entire projects or reports for record keeping & compliance

Learn More
Dashboard interface showing Budget and Committed metrics, a dropdown menu with options to Download PDF or Share Dashboard highlighted with a cursor, and key performance indicators for Scope, Time, Cost, Risk, Safety, and Quality.
Cost

Project cost management software for total control

Project Budgeting

Digital ledgers and smart forms for financial precision

Variance Analysis

Track costs back to budgets and see unders/overs

Commitments

Centralize all contracts & payments back to budgets

‍Cash Flow & Forecasting

Report on cash flow actuals, forecasts, and baselines

Learn More
Finance dashboard showing Budget vs Actual chart with colored bars for Budget, Variance, Forecast Final Cost, and Payment Progress, and a Finance Bar Chart by Project with purple and green bars.
Schedule

Know what’s happening, what’s next, and what’s at risk

Complete Visibility

Manage the complete project lifecycle across your portfolio

Key Milestones

Tracks your project through key milestones

Track Phases & Stages

Manage projects through clear phases, stages and gates

Health Reporting

Measure performance of a portfolio of projects

Learn More
Project schedule interface showing task progress with green checkmarks, colored bars, and icons, overlaid with Oracle P6 and Microsoft Project logos.
Risk

Risk management made easy

Best Practice

Risk Management process made simple and configured to your likelihood & impact ratings

Impacts & Treatments

Streamline Risk Analysis on your 5x5 or 4x4 Risk Matrix and identify Treatments

Report & Workshop

Visualize Risks for fast, easy reporting and workshopping. Generate a Risk Register

Project or Program

Maintain Risk Registers at a Project or Program / Portfolio level

Learn More
Project risk matrix for Pre-Treatment showing likelihood versus impact with colored risk levels and a table listing three risks with post-ratings labeled Low, Very Low, and Medium.
Document Management

Everything you need for document management

One central hub

Store every contract, report and project file in one secure place.

Organized project folders

Structure every project with clear, consistent folders your whole team can navigate.

Find and preview documents

Search by file name and preview PDFs, Word documents, and Excel spreadsheets before downloading.

Linked to finances

See every document tied back to its source in your project - contract, payments, changes and more.

Learn More
Mastt document library with project folders, PDF, Word, and Excel files, and an open Actions menu for moving, downloading, or deleting a file.

Consultant-ready templates for governance and reporting

Pre-built by real consultants. Trusted by top firms. Mastt’s best-practice templates help you cut hours of setup, standardize delivery, and win client confidence from day one.

FAQs about project management software for consultants

How much does Mastt cost for consulting teams?

Mastt is free for the first project. Professional plans average $165 per project per month. Enterprise pricing is custom for larger portfolios. Get more details on Mastt's Pricing page.

Where can I preview Mastt before using it with clients?

Mastt's Product Tour page shows reporting, cost, schedule, and risk workflows in context, including how client delivery works across a portfolio. The Help Center has setup guidance and how-to steps for each area.

Can consultants collaborate with clients and project stakeholders in Mastt?

Yes. Teams can work from a shared project workspace. Stakeholders can view the same project controls data and reports. Documents stay attached to related records.

Can I keep audit-ready records for governance reviews?

Yes. Point-in-time snapshots of reports and registers are stored for governance reference. Change history is reviewable across key records, keeping a clear trail across reporting cycles.

Can I track milestones, key dates, and schedule updates?

Yes. Milestones, phases, and key dates are tracked per project, with schedule imports available or timeline updates maintained directly in the platform. Schedule status stays aligned to reporting periods. Check out Mastt's project scheduling module to learn how it works.

Does Mastt include project risk management for consultants?

Yes. A risk register with owners, impacts, and treatments is maintained per project. Actions, due dates, and closure status are tracked, with consistent risk fields available across all projects. For more details, check out Mastt's risk management module.

Can I manage contracts, change orders, and payment reviews as a consultant?

Yes. Contracts, change orders, and approval status are recorded in one workflow. Payments and invoice records are tracked alongside contract records, with supporting documents linked to each item.

Can I produce client-ready project reports in Mastt?

Yes. Dashboards and status reports pull from live project data and hold the same layout each reporting cycle. Mastt's construction reporting module covers dashboards, status reports, and recurring reporting structures.

Does Mastt support consultant cost reporting and forecast tracking?

Yes. Budget, commitments, actuals, and forecast position are tracked in one structure. Cost items stay linked to contract and payment records, with exports available when clients request files.

Can I standardize reporting templates across clients?

Yes. Reporting templates are saved and reused across projects, with the same structure applied across clients. Reports are stored for later retrieval when clients or auditors request records.

Is Mastt a good project management software for consultants?

Yes. Mastt supports consultants managing construction projects for multiple clients. It includes reporting, cost control, schedule tracking, and risk registers. It suits owner-side and PM consultant workflows.

Can I manage multiple client projects in one platform?

Yes. Many projects run in one account, each keeping its own records, approvals, and reports. Projects can also be viewed as a program or portfolio for consolidated oversight across all clients.

Start for Free Today

Get access to Mastt instantly and start automating work in minutes