Noah Loyola

Noah Loyola

Video Producer

Marketing

Philippines

LinkedIn
With Mastt since 
2025

About 
Noah Loyola

Noah Loyola is a Video and Content Producer at Mastt, where he creates video content across short-form social clips, product walkthroughs, and brand storytelling. He stays on top of the latest editing trends and platform shifts, and brings a keen eye for detail to every cut, transition, and frame. Because for Noah, the small things are what separate a good video from a forgettable one.

Before Mastt, he worked on several Philippine feature films, including Moneyslapper (2024), which won him Best Editing at the Young Critics Circle Awards. He brings that same filmmaker's sensibility to every piece of content he produces at Mastt.

I never want my work to feel predictable. The best videos keep you interested through the small choices, the pacing, the framing, a detail you didn’t expect, and that’s what I’m always reaching for.
-Noah Loyola

Outside of Work

Noah is a candid photographer in his spare time, drawn to the unposed moments that are hardest to capture but always the most honest. Away from the camera, he plays Magic: The Gathering with friends. For him, it's a game that rewards creative thinking, and where the company around the table matters as much as the cards.

Meet the people behind Mastt

Mastt is built by a team with real roots in construction and technology. Get to know the people working to make every capital project run better.