Construction Bid Template

Enter your email below to download the file.

By downloading, you agree to receive marketing emails from Mastt. Unsubscribe anytime.

Oops! Something went wrong while submitting the form.
Free Template

Construction Bid Template

Free construction bid template to prepare professional, competitive proposals. Standardize pricing, improve accuracy, and win more projects with consistent bid documentation.

Templates
Word Template
Excel Template
Powerpoint Template
Construction Bid Template
Template by
Jackson Row
Published:
Oct 14, 2025
Updated:
December 3, 2025

What is a Construction Bid Template in Construction?

A construction bid template is a structured workbook a general contractor uses to price and submit a formal offer for a project. It holds the priced schedules behind the number, the markup cascade applied to reach it, and the qualifications and exclusions that define what the price actually covers.

Bid form, bid sheet and bid template describe the same artifact. Some owners issue a prescribed bid form that must be returned exactly as received, in which case this workbook is where you build the price before transcribing it across. On commercial construction work a bid is rarely a single figure, which is why the document runs to several priced schedules rather than one page.

What to Include in a Construction Bid Form: Key Components

A construction bid form needs six things: bidder details, the formal offer, priced schedules, allowances, exclusions and a compliance checklist. Everything else supports those.

Sheet What it holds
Bid Summary Bidder details, contractor license number, the formal offer, the priced summary and the signature block.
Schedule of Prices Trade sections priced by quantity and rate, usually taken from a schedule of values where one has been issued.
General Conditions General conditions priced as fixed cost or per week against the construction duration.
Allowances Allowances and owner-directed cost items, with the date the owner must instruct by.
Alternates & Value Engineering Add and deduct alternates, shown separately and excluded from the base bid.
Unit Rate Schedule Unit prices for measured or variable work, used to price change orders after award.
Qualifications & Exclusions What is not priced, stated in commercial language.
Bid Compliance Checklist Addenda acknowledged, bid bond, insurance certificates and every submittal the owner requires.
Lists Tax rate, markup percentages, construction duration and bid due date.

Two things separate this from a spreadsheet with a total at the bottom. Alternates never enter the bid price until the owner accepts them in writing, which stops an option being read as part of the base offer. And the compliance checklist is worked last, because a bid gets rejected on a missing addendum acknowledgment before anyone looks at the price.

Construction Bid Example: A Completed Bid Summary

Here is an example of a completed construction bid template, priced at 62.2 million including tax.

Construction bid template example with trade sections, preliminaries, mark-up cascade, tax and total bid price.
Construction bid example showing priced summary, markup cascade and total bid price.

How to Fill Out a Construction Bid Template in Excel

Set the global inputs first, then price from the bottom up. The bid summary calculates itself, so nothing on it should ever be typed.

  1. Complete the cover with the project, owner, bid due date, currency and bid validity period
  2. Set the tax rate, markup percentages and construction duration on Lists, since every priced sheet reads from there
  3. Price the trade sections on Schedule of Prices by quantity and rate, adding rows inside a section block so the subtotals keep working
  4. Price general conditions, entering time-related items per week against the duration and fixed items as a lump sum
  5. Record every provisional sum, prime cost item and allowance, with the date the owner must instruct by
  6. Enter add and deduct alternates, leaving them unaccepted so they stay outside the base bid
  7. Complete the unit rate schedule, since these rates price change orders after award
  8. Write your qualifications and exclusions before you submit, not after a question is asked
  9. Clear the compliance checklist last, confirming every addendum, bond and required submittal

Change the construction duration and the general conditions reprice automatically. That single link is what makes a bid defensible when an owner asks what a four-week extension would cost.

Commercial Construction Bid Templates: What Changes

A commercial bid template carries requirements residential work does not, and most of them can void a bid rather than just weaken it.

  • Bid security: A bid bond, bank guarantee or surety, commonly 5% of the bid price, is usually mandatory on commercial and public work
  • Prequalification: Many owners require you to be prequalified before you may submit at all, with financial capacity assessed and a category assigned
  • Addenda acknowledgment: Every addendum issued during the bid period must be acknowledged on the bid form. A bid that misses one is routinely rejected unread
  • Alternates and unit prices: Owners frequently require priced alternates and a schedule of unit prices for future change orders, both as separate submissions
  • Prescribed bid forms: Public and institutional owners often mandate their own form, including standard AIA documents. Where that applies, price the work here and transcribe the figures onto the form they issued

How to Price a Construction Bid: Markups, Allowances and Alternates

Markups are applied in sequence, not as one combined percentage, and the order changes the number.

Site overheads apply to the net construction cost. Head office overheads apply to that subtotal. Margin applies to the running total after both. Risk and contingency applies last. Compounding them in order produces a materially different figure from adding the percentages together and applying them once, and the gap widens with the size of the bid.

Provisional sums and prime cost items carry an attendance and profit percentage on top, because you are managing work you have not priced. Allowances behave the same way. All three should show the date the owner must instruct by, since a late instruction becomes a delay claim rather than a pricing problem.

Alternates sit outside the total entirely. Offering an add and a deduct gives the owner a way to bring a bid into budget without you dropping your base price, which is the practical purpose of value engineering at bid stage.

Bid vs Proposal vs Quote vs Estimate: What's the Difference?

These four get used interchangeably and are four different documents.

Aspect Bid Proposal Quote Estimate
What it is A formal priced offer against issued documents A narrative pitch with pricing A fixed price for defined work An internal cost forecast
Triggered by An invitation to bid An owner request or a pitch A client asking what it costs Your own planning
Binding Yes, for the validity period Usually not Yes, once accepted No
Contains Priced schedules, qualifications, compliance Approach, experience, methodology, price Scope and a price Quantities, rates, contingency

If the owner asked for your approach and experience alongside a price, you need a construction proposal template. If a client asked what a defined piece of work costs, use a construction quote template. If you are building the number for yourself before deciding what to bid, that is a construction estimate template.

Mastt AI interface to generate construction bid templates instantly - chat-based tool creates professional proposals in seconds with secure document upload

Create Winning Construction Bids with Mastt AI

Mastt AI transforms bid development by generating tailored templates that match project requirements while maintaining the professional polish owners expect. Every template includes proper structure, complete sections, and flexibility to adapt as solicitation requirements change.

👉 Try Mastt AI today and create professional construction bid templates that increase win rates while reducing preparation time.

Related Articles and Templates

Explore these resources for construction bids, tendering, estimating, pricing, and proposals:

FAQs About Construction Bid Templates

Nothing meaningful. The bid is the offer, and the bid form is the document it is submitted on. Where an owner issues a prescribed form, that form is the offer and any workbook behind it is your own working paper.
That is the owner's document rather than the contractor's. An invitation to bid is issued to solicit offers, and a construction bid is what a contractor returns in response. If you are the owner running the solicitation, the document you need is the invitation to bid and its instructions to bidders, not a bid form.
Anything you have not priced, stated explicitly. Permits, owner-supplied items, testing, out-of-hours work, escalation beyond a stated date, and any work dependent on information not yet issued. An exclusion written into the bid is a commercial position. The same point raised after award is a dispute.
Commonly 30, 60 or 90 days from the bid due date. Where the instructions to bidders fix the period, that period governs, and stating a shorter one risks the bid being ruled non-responsive. Where it is left to you, remember that the longer the validity, the longer you carry material price risk without a signed contract.
Excel for the pricing, because quantities, rates, markups and totals recalculate as the bid develops. Word suits the cover letter and narrative sections. Many owners require the priced schedules as a spreadsheet regardless.
Yes, and the structure is identical. A subcontractor bid is narrower in scope but carries the same requirements: priced schedules, exclusions, a validity period, and acknowledgment of the documents it was priced against.
Topic: 
Construction Bid Template

Written by

Jackson Row

Jackson Row is the Growth & North American Market Lead at Mastt. With a background in risk modeling, cost forecasting, and integrated project delivery, he helps capital project owners work smarter and faster. Jackson’s work supports better tools, better data, and better outcomes across the construction industry.

LinkedIn Icon
Back to top

Frequently Asked Questions