Mastt Logo
About
Products
Blue geometric icon composed of two overlapping diamond shapes, one slightly above and behind the other.
Mastt Platform
Capital project & program management
Three black star shapes of varying sizes on a gradient blue and green background.
Agent
New
AI Agent built for project teams
Agentic AI
A simple white robot head icon with two eyes and an antenna on a dark background.
Agent
Delegate work by email, let your Agent handle the rest
White four-pointed star-shaped sparkle icon on a dark blue-gray background.
Ask
Chat with your AI Agent in real-time
Minimalist white icon of three vertical lines and a diagonal line resembling a stylized book.
Knowledge
Put your company's know-how behind every task
Three white rounded rectangles arranged in a grid on a dark blue background.
Templates
AI drafts in your templates and branded
Two interlinked chain links forming a diagonal connection on a dark gray background.
Workflows
Automate repeatable project tasks across the platform
Blue geometric icon composed of two overlapping diamond shapes, one slightly above and behind the other.
Mastt Platform
Capital project & program management
Three black star shapes of varying sizes on a gradient blue and green background.
Agent
New
AI Agent built for project teams
Projects
Dashboard interface featuring five vertical bars in blue, each with a white icon representing a document, schedule, clipboard check, chart, and user from left to right, above a calendar grid with a highlighted date and various rectangular blue and gray blocks indicating events or tasks.
Dashboard
Live visual reporting across all project data
White dollar sign centered inside a solid blue circle, representing cost or money.
Cost
Manage budgets, contracts, payments & forecasting
Blue rounded square icon with three white horizontal lines of varying length, each line aligned to form a descending stair-step pattern, symbolizing a schedule or timeline.
Schedule
Set timelines, milestones, and track delivery
Solid blue equilateral triangle.
Risk
Track risks, issues, and mitigation actions
Documents
All your files in neat folders, with AI chat
Program/Portfolio
Blue organizational chart icon with one top node connected to three lower nodes in a horizontal line.
Program
Automated roll-up of data from all projects
Contact Sales
Product Tour
Who We Serve
Business Types
Simple blue icon of a house with a triangular roof and a rectangular door in the center.
Project Owners
Control capital project outcomes with trusted oversight
Blue minimalist house icon with pointed roof and rounded-top door.
Real Estate Developers
Manage your entire portfolio with confidence
Blue generic user profile icon with a round head and rounded shoulders silhouette.
Project Management Consultant
Run professional projects from a single platform
Owner's Representative
Streamline reporting and keep every project on track
Use Cases
Project ControlsContract ManagementPMIS Software
Industries
Aviation
Education
Energy
Healthcare
Industrial
Infrastructure
Public Works
Retail
Utilities
See All Industries
Contact Sales
Product Tour
Pricing
Customers
Resources
Learn
Free Templates
Download free tools, guides, checklists, plans and more
Dashboard Examples
Download free dashboards & reports
Articles
Learn about Construction Project Management best practices
Two blue stylized books, one standing upright and the other leaning against it at an angle, each with white rectangular label areas on the covers and spines.
Topics
Full guides on the important topics around construction management
Webinars
Watch ConTech in action
SUPPORT
FAQs
Get answers for common questions
Get Help
Expert coaching, technical support and guidance
Blue shield icon with a white check mark inside, representing security or verification.
Trust Center
Learn how we protect your data and privacy.
Latest Webinar
Smarter Project Cost Management with AI, Dashboards, and ERP Data

October 1, 2026

Smarter Project Cost Management with AI, Dashboards, and ERP Data
Contact Sales
Product Tour
Log In
Australia / APAC
North America Region
MENA
Map of Southern Europe and surrounding areas showing Italy with its boot-shaped peninsula, the islands of Sicily and Sardinia, parts of France, Spain, Greece, and nearby Mediterranean Sea in blue and landmasses in green.
Rest of World
Log InStart for Free
02 9133 4355
Request a Demo
|
Log In
Australia / APAC
North America Region
MENA
Map of Southern Europe and surrounding areas showing Italy with its boot-shaped peninsula, the islands of Sicily and Sardinia, parts of France, Spain, Greece, and nearby Mediterranean Sea in blue and landmasses in green.
Rest of World
Start for Free
Mobile Menu Icon

We use cookies to improve site navigation, analyse site usage. You can opt out of cookies by clicking reject below. See our Cookie Policy for more details.

AcceptReject
Trust Center
Onboarding
Privacy
SecurityWebsite Privacy PolicySoftware Privacy PolicyCookie Policy
Legal
Subscription TermsEnterprise Terms & ConditionsMastt Acceptable Use PolicyService Level AgreementAI Product TermsReferral Program Terms
Agent
Data PrivacyService Level AgreementTerms & ConditionsCyber Security
Company
Trademark
Book a meeting

Mastt Referral Program Terms

Last Updated: 27 October 2026

1. About these terms

1.1 These terms govern your participation in the Mastt Referral Program (Program), operated by Mastt Australia Pty Ltd (ABN 78 624 216 075) (Mastt, we, us).

1.2 By registering for the Program, you agree to these terms. If you register on behalf of a company, you confirm you have authority to bind it.

1.3 In these terms:

  • Referrer (you) means the person or company registered in the Program.
  • Referral means a company you introduce to Mastt through your referral link or another method we accept.
  • Program Page means the Referral Program page in the Mastt web app, and any other page we nominate, setting out the current Reward and Reward conditions.
  • Reward means the payment described on the Program Page.
  • Referral Portal means the third-party referral platform we use to run the Program, currently Dub (dub.co), or any replacement platform we notify you of.

2. Who can participate

2.1 Anyone aged 18 or over may join the Program, whether or not they are a Mastt customer.

2.2 You may not participate if you are:

  • a Mastt employee, contractor or director, or a member of their immediate household; or
  • prohibited by your employer, client or any law or policy from receiving a Reward for the introduction.

2.3 You are responsible for making sure that accepting a Reward does not breach any obligation you owe to your employer, your clients or the Referral. If you are a consultant or adviser to the Referral, you must disclose the Reward to them where required.

2.4 We may decline or cancel any registration at our discretion.

3. Eligible referrals

3.1 A Referral is eligible only if, at the time you refer them, the Referral:

  • is not an existing or former Mastt customer;
  • has not already started a commercial engagement with Mastt, including an active sales conversation, trial, proposal, pilot or procurement process; and
  • has not already been referred by someone else.

3.2 The Referral must become a paying Mastt customer within 6 months of the date you refer them.

3.3 You may not refer yourself, your own company, or a company you control.

3.4 If two or more Referrers introduce the same company, the first referral recorded in the Referral Portal takes priority.

3.5 We decide whether a Referral is eligible, acting reasonably. Our records, and those in the Referral Portal, are final in the absence of manifest error.

4. Rewards

4.1 The Reward amount, the conditions for earning it, and payment timing are set out on the Program Page. They are subject to change.

4.2 A change to the Program Page applies to Referrals made after the change. A Referral made before the change keeps the Reward and conditions shown when you made it.

4.3 Unless the Program Page says otherwise:

  • Rewards are stated in Australian dollars and are inclusive of any GST;
  • a Reward is paid within one month of the Referral becoming a Mastt customer, which happens when its first payment to Mastt has cleared; and
  • one Reward is payable per Referral, however many people or entities within that company sign up.

4.4 Rewards are paid through the Referral Portal to the payout account you set up there. You must provide accurate payout and tax details, and any information the Referral Portal provider needs to verify your identity.

4.5 You are responsible for any tax payable on Rewards you receive.

4.6 If a Reward is paid in error, or the Referral's first payment is refunded, reversed or charged back, we may deduct the amount from any future Rewards payable to you. We will not otherwise seek repayment.

4.7 Rewards cannot be transferred or exchanged for Mastt credits unless we agree.

5. Your conduct

5.1 You must promote Mastt honestly. You must not:

  • make false or misleading claims about Mastt, its products or pricing;
  • present yourself as a Mastt employee, agent or partner;
  • send spam or unsolicited bulk messages, or breach anti-spam or privacy laws;
  • bid on Mastt brand terms in paid search, or use Mastt trademarks except as we permit; or
  • create fake accounts, self-referrals or any arrangement designed to earn a Reward unfairly.

5.2 If we reasonably believe you have breached these terms, we may withhold or recover Rewards and remove you from the Program.

6. Your data

6.1 We collect the information you and your Referrals provide through the Program, such as names, contact details, company details and payout details.

6.2 We use it only to run the Program, including tracking Referrals and paying Rewards.

6.3 We will not share it outside Mastt and the Referral Portal provider, except where required by law. The Referral Portal provider handles your information to track and manage the Referrals you submit and to pay your Rewards. It does so under its own privacy policy.

6.4 Before you share someone's contact details with us, you must have a reasonable basis to believe they are happy to be contacted by Mastt.

6.5 Our Privacy Policy also applies.

7. Changes and ending the Program

7.1 We may change these terms, or suspend or end the Program, at any time by updating this page or the Program Page.

7.2 If we end the Program, we will still pay Rewards for eligible Referrals made before the end date that meet the conditions within the 6-month window.

7.3 You may leave the Program at any time by contacting referrals@mastt.com.

8. General

8.1 You participate as an independent party. Nothing in these terms creates an employment, agency, partnership or joint venture relationship.

8.2 To the extent permitted by law, our total liability to you in connection with the Program is limited to the Rewards payable to you under these terms. Nothing in these terms excludes rights you have under the Australian Consumer Law that cannot be excluded.

8.3 These terms are governed by the laws of New South Wales, Australia. You submit to the non-exclusive jurisdiction of the courts of New South Wales.

8.4 Questions about the Program can be sent to referrals@mastt.com.

Mastt Logo

Solutions

Project OwnersReal Estate DevelopersProject Management ConsultantsSmall BusinessesGovernmentOwner's Representative

Product

CPMS
ProgramDashboardCostRiskScheduleDocuments
Agent
AgentAskWorkflowsKnowledgeTemplatesAll Features

Industries

Aviation
Education
Energy
Healthcare
Industrial
Infrastructure
Public Works
Retail
Utilities
All Industries

Customers

Featured CustomerSuccess Stories

Compare

CPMS
Mastt vs ProcoreMastt vs KahuaMastt vs InEightMastt vs AconexMastt vs iTWOcx
Agent
Mastt vs Claude

Resources

ArticlesTopicsGlossaryResearchFAQContributorsEditorial ProcessFree TemplatesWebinarsProject Management FirmsRisksHelp Pages

Company

AboutAboutTeamContact UsCareersWebsite Privacy PolicyLegalCookie PreferencesSecurity
© Copyright 2026 Mastt.
Be part of our community
LinkedIn Icon